No. Label No. of villas & hotels No. of floors No. of rooms/ floor Total no. of rooms No. of persons/ acc. Villas surface (m2) Building footprint (m2) Building surface (m2)
1 Vila DION 200 2 2 800 1,600 100 20,000 40,000
2 Vila GALATEA 150 1 2 300 600 100 15,000 15,000
3 Vila ANDINI 148 1 1 148 296 90 13,320 13,320
4 Vila NOAR 71 1 1 71 142 100 7,100 7,100
5 Vila GLAUKIA 10 2 6 120 240 375 3,750 7,500
6 Vila ANZOTIKA 24 2 2 96 192 100 2,400 4,800
7 Hotel SIAR 1 7 48 336 672 2,070 2,070 14,490
8 Hotel SION 1 7 28 196 392 2,000 2,000 14,000
9 Hotel EMEL 1 10 50 800 800 1,380 1,500 13,800
10 Hotel DEAN 1 9 150 300 2,000 9,000
607 3,017 5,234 6,315 69,140 139,010


Project : KRORËZ PARK RESORT
Location : Krorëz, Albania
Surface : 150 Ha
Typology : Complex/Resort
Actual status : in progress


Project Date: 03/2014 – 04/2016
Project Value: -.00 €


Consultant:

Studio Archimed sh.p.k
Str. Dhimitër Shuteriqi
Tirana, Albania
Phone/Fax: +355 44 304 827
www.archimed.al
info@archimed.al

Client/Beneficiary:

South Coast Development sh.p.k
Str. Dhimitër Shuteriqi
Tirana, Albania
Phone/Fax: +355 44 304 827
www.southcoastdevelopment.al
info@southcoastdevelopment.al

Financed:
Searching for partnership








Currently underway in the unique southern Albanian bay of Krorëz, the "Krorëz Park Resort" project is a result of the collaboration between Studio Archimed and South Coast Development. The scope of this project incorporates the accommodation of 5,000 people in 4 hotels and 602 villas, commercial developments, parks, entertainment, cultural sites, and facilities.
The scale of the development makes it the largest and only elite resort complex in the region.
The "Krorëz Park Resort" is more than just a project, it is space that offers its guests luxurious and relaxing accommodations with grand picture windows that reveal sweeping views of the Ionian Sea and the Shëndelli mountains.
The resort is designed with a philosophy of adjusting and blending with the existing natural terrain topography. It is strategically located on a gentle hill sloping down into the sea, offering a sense of natural immersion with the environment for its visitors. The concept of combining the new structures with the earth's features is not only for architectural aesthetics, but to encourage a sense of well being, higher quality of life, and also a deeper connection with nature.
This organic structure promotes bonding between individuals and families and encourages a strong community build.
Be part of the historical land of the Helen of Troy "Krorëz Park Resort".

Read More...

Energy Efficient Rehabilitation of Student City 2 in Tirana, Albania

Energy Efficient Rehabilitation of Student City 2 in Tirana, Albania

Studio Archimed was responsible for Energy...

Studio Archimed was responsible for Energy Efficient Rehabilitation of Student City 2 in Tirana, Albania. This included:

- Design of all mechanical engineering systems (Fire Safety, Plumbing, HVAC), Energy Engineering and Energy Audit Report;
- Supervision works in frame of the pilot project from KfW Development Bank.


Project Date: 02/2014 – Ongoing
Project Value: 5,794,000 €


Consultant:

Joint Venture (JV) of INTEGRATION-Grafenberg, Grontmij-Frankfurt, SymbioticA-Albania, Cityforster – Rotterdam
Street: Thoma Kacorri No.5 “SKAI” Building. “6th floor”. 1023 Tirana- Albania
Phone: +355 4 4501692
www.symbiotica.net
e-mail: info@archimed.al

Client/Beneficiary:

Ministry of Energy and Industry (MEI)
Scanderbeg Square
Tirana, Albania

Financed:

KfW Development Bank Office Albania - Tirana
Scanderbeg Street, 21/1, 3rd Floor
Tirana, Albania
Phone: +355 42 22 78 69
e-mail:kfw.tirana@kfw.de


The concept for "Student City 2" aims to show the potentials of energetically efficient reconstruction, modern student accommodation and the advantages of private and public cooperation. As buildings are primarily susceptible to dilapidation and humidity, the focus of the energy concept is on the replacement of the basic infrastructure, based on an adequate ventilation and heating system including shaded windows. In response to the students needs, the design concept provides for a convenient layout of the student rooms with attached bathrooms and an additional use modification of the lounges. This creates more living space and allows much needed privacy. The added outdoor space on the rooftops allows for a variety of collaborative uses in the area of environmental, economic and social sustainability according to the needs and aspirations of users, helping "Student City 2" to become Albania's pilot project in the field of energy-efficient construction.

Read More...

Consultancy and Supervision Works for Devoll Hydropower Sh.A

Consultancy and Supervision Works for Devoll Hydropower Sh.A

Our mission included supervision works...

Our mission included supervision works in the frame of ESM Project for Moglica and Banja HPP:

- Construction of Popcisht Community Center;
- Construction of 18 resetlement houses;
- Construction of 21 ressetlement houses in Maliq;
- Construction of Driza School;


Project Date: 08/2015 - 11/2018
Project Value: 2,451,936 €


Consultant:

Studio Archimed
Street: Andon Z. Çajupi, pll.22
Tirana, Albania
Mobile: 00355 692095975
www.archimed.al
info@archimed.al

Client/Beneficiary:

Devoll Hydropower Sh.A
ABA Business Center, Office 1204
Papa Gjon Pali II
Tirana,Albania
Phone: +355 4 450 14 50
www.devollhydropower.al

Financed:

Devoll Hydropower Sh.A
ABA Business Center, Office 1204
Papa Gjon Pali II
Tirana,Albania
Phone: +355 4 450 14 50
www.devollhydropower.al

Popcisht Community Centre was part of the ESM Construction Projects in Popcisht Village. The project consists in the construction of a building with an area of 85 m2 with a maximum height of the structure of 5.1 m from the ground level.

Ressetlement Houses: Devoll Hydropower Sh.A has constructed two Hydropower Plants in two cities Gramsh and Maliq. Before the construction of Banja Hydro Power Plant in Gramsh city was neccessary to relocate 18 houses. These houses were resettlemented and constructed in 8 different villages (Kodovjat, Qerret, Driza, Cingar, Dushk, Cerruje, Gramsh and Banje), in a total construction area of approximately 1719 m2 divided in four different models respectively 76, 95, 120 and 150 m2. While in Maliq city became neccesary to construct 21 houses for residents affected by Moglica HPP. These houses occupied a total construction area of approximately 2120 m2 divided in four different models respectively 70, 100 and 120 m2. The construction of the houses also included the connection to the electricity line, sewage & white water system and inner roads.

Driza School: In the Driza village was proposed to build a new 9-year school by almost the same features and dimensions as the existing school, which was located in the area to be flooded by hydropower of Banja. The new school has a surface of 660 m2. It retains the same facilities as the existing school, with the change from 9 classes added a pre- primary class and the sanitary facilities as well as included in the new building.


Read More...

Supervision Works in the frame of ESM Project for ​Banja HPP

Supervision Works in the frame of ESM Project for ​Banja HPP

In the frame of ESM Project for Banja...

In the frame of ESM Project for Banja HPP, our group scope of work included:

- Supervision of Shtepanj irrigation channel;
- Supervision of works for construction of a waste water treatment plant for Gramsh Municipality and Pishaj Commune;
- Supervision of construction of the Potable water system for the villages Shushice, Drize and Cerruje.


Project Date: 05/2016 - 07/2018
Project Value: 1,851,890 €


Consultant:

Studio Archimed
Street: Andon Z. Çajupi, pll.22
Tirana, Albania
Mobile: 00355 692095975
www.archimed.al
info@archimed.al

Client/Beneficiary:

Devoll Hydropower Sh.A
ABA Business Center, Office 1204
Papa Gjon Pali II
Tirana,Albania
Phone: +355 4 450 14 50
www.devollhydropower.al

Financed:

Devoll Hydropower Sh.A
ABA Business Center, Office 1204
Papa Gjon Pali II
Tirana,Albania
Phone: +355 4 450 14 50
www.devollhydropower.al

Rehabilitation of the Shtepanj irrigation channel is in distance about 3.5 km from the intake. It has been combined with cleaning and repairing works for irrigation channel structures, to allow for the required quantity of water to reach the last edge of the channel.

The Waste Water Treatment Plant included mechanical purification for the sewage and digestion for the settled sludge. Special consideration has bene applied and preparatory measures has been implemented on the site of the WWTP to the fact that the sewage collection system is a mixed system. Therefore waste and rain water were collected and diverted to the WWTP.

DHP in the framework of replacing the existing infrastructure, planned to build a water supply system for the villages of Shushice, Drize and Cerruje, as part of the resettlement infrastructure affected by the construction of Banja hydro power plant.

Read More...

Construction of the Rural Roads on the South Shore of Moglice HPP

Construction of the Rural Roads on the South Shore of Moglice HPP

Scope of work included supervision of...

Scope of work included supervision of the construction of two rural roads segments:

- Rural Road Segment 2A – National Road Gramsh – Maliq – Peshtan Village – Kodras (Pulaha Lart) Village – Approx. 7.4 Km;
- Rural Road Segment 2B – National Road Gramsh – Maliq – Gjinikas Village – Approx. 4.2 Km;


Project Date: 01/2018 - 12/2018
Project Value: 1,729,810 €


Consultant:

Studio Archimed
Street: Andon Z. Çajupi, pll.22
Tirana, Albania
Mobile: 00355 692095975
www.archimed.al
info@archimed.al

Client/Beneficiary:

Devoll Hydropower Sh.A
ABA Business Center, Office 1204
Papa Gjon Pali II
Tirana,Albania
Phone: +355 4 450 14 50
www.devollhydropower.al

Financed:

Devoll Hydropower Sh.A
ABA Business Center, Office 1204
Papa Gjon Pali II
Tirana,Albania
Phone: +355 4 450 14 50
www.devollhydropower.al

This project was implemented in the frame of the Replacement Infrastructure process and the Statkraft’s Environmental and Social Management program in support to the communities affected due to the implementation of Moglicë HPP.

Read More...

New Pre-trial Detention Center and Prison in Shkodra, Albania.

New Pre-trial Detention Center and Prison in Shkodra, Albania.

Archimed scope of work was Design and...

Archimed scope of work was Design and Supervision works for the Construction of the ‘New Pre-trial Detention Center and prison” in Shkoder, Albania.

Project Date: 11/2011 – 06/2018
Project Value: 18,000,000 €


Consultant:

iC consulenten
Street: Sulejman Delvina
Erwin Puschnigg (Team Leader)
Phone: +355 48 30 25 76 /78
Mobile: +355 68 2061 084 : +43 664 1503 206
e.puschnigg@ic-group.org
www.ic-group.org

Client/Beneficiary:

Ministry of Justice, Republic of Albania
Boulevard of “Zogu i Pare”
Tirana, Albania
Phone/Fax: + 355 4 22 33591
www.justice.gov.al

Financed:

Delegation of the European Commission in Albania
ABA Business Center, Papa Gjon Pali II Str., 17th floor
Tirana, Albania
Phone: (+355) 4 222 8320
Fax: (+355) 4 223 0752
delegation-albania@eeas.europa.eu

This project had significantly contributed towards a more efficient functioning of the Penitentiary system in Albania thus ensuring:
- Improved respect for human rights and the rights of detainees;
- Improved living conditions for pre-trial detainees and detainees;
- Reduction of overcrowding in penitentiary centers.

The project has foreseen also the introduction of a more efficient, rational and sustainable utilization of energy by applying, in addition to traditional sources of energy such as petrol and gas, alternative renewable sources of energy like solar panels, in accordance with the EU Directive 2010/31 of 19 May 2010 on the energy performance of buildings.

Read More...

110 kV OHL South Albania – Construction of Orikum and Himare 110/35/20 kV Substations

110 kV OHL South Albania – Construction of Orikum and Himare...

We were part of entire permit taking...

We were part of entire permit taking procedure and Superintendency phase, a full engagement with Civil and Electrical disciplines.


Project Date: 03/2017 – 05/2018
Project Value: 6,000,000.00 €

Consultant:

Končar – Power Plant and Electric Traction Engineering Inc. Business Unit Transmission and Distribution
Project Director, Dominik Krajtner
Phone: +385 99 573 91 33
Fax: +355 4 2362 937
dominik.krajtner@koncar-ket.hr
Project Manager, Zoran Augustinović
zoran.augustinovic@koncar-ket.hr

Client/Beneficiary:

OST - Transmission System Operator
Tirane – Durres Highway, 9 th Km
Yrshek, Kashar
Tirana, Albania
Phone: +355 04 222 55 81
info@ost.al

Financed:

KfW Development Bank Office Albania - Tirana
Scanderbeg Street, 21/1, 3rd Floor
Tirana, Albania
Phone: +355 42 22 78 69
kfw.tirana@kfw.de

As part of the construction of the 110 kV Circuit Line South Albania, two new substations, Orikum 110/35/20 kV and Himare 110/35/20 kV, have been put into operation.

The substations are part of the 110 kV transmission line project for southern Albania (110 kV Circuit Line South Albania) funded by the German Development Bank KfW. The end user or buyer of the substation is the OSHEE - the distribution system operator of Albania, which is in the phase of intensive investments and works on the renewal of energy facilities.

Read More...

Engineering Services for TAP Project in Albania

Engineering Services for TAP Project in Albania

Our group services were: -...

Our group services were:
- Engineering Services for Construction Permit CDPII- ACS03 Compressor Station in Albania.
- Design and Consultancy services for the “Local Engineering Services by licensed architect and fire protection”.

Project Date: 01/2013 - 04/2018
Project Value: - €

Consultant:

ABKONS ltd
Street: Themistokli Gëmenji
Tirana, Albania
Phone: 04 225 8326
www.abkons.com

TRACTEBEL ENGINEERING S.p.A
Pasquale Palmieri (Project manager)
Phone: +39 06 20399.051
pasquale.palmieri@gdfsuez.com
www.tractebel-engineering-gdfsuez.com

Client/Beneficiary:

ASPROFOS S.A.
284, El. Venizelou - GR176 75
Kallithea -Athens-Greece
Phone: (+30) 210 94 91 600
Fax: (+30) 210 94 91 610
AFCM@asprofos.gr
www.asprofos.gr

C&M Engineering S.A.
99, Pratinou str. – GR 11634
Athens, Greece
Phone: (+30) 210 72 20 014
Fax: (+30) 210 72 20 298
mail@cmengineering.gr
www.cmengineering.gr

Financed:

E.ON Technologies GmbH
Alexander-von-Humboldt-Straße 1, 45896 Gelsenkirchen, GERMANY
Tirana, Albania
Phone: +49 209 60105
www.eon.com

Trans Adriatic Pipeline AG Albania, Branch
Building No.12 (ABA Business Centre)
Phone: +355(4)4 306 937
tapshqiperi@tap-ag.com



In the first phase of pipeline construction in Albania, a compressor station and a metering station has been built near Fier, and near Bilisht, respectively. In a second phase, should the pipeline capacity be expanded to 20 billion cubic metres (bcm), the metering station near Bilisht will be turned into an additional compressor station.

The ACS03-Compressor Station in Fier is designed to meter and compress natural gas for further transportation purposes. The station is designed in a block design, which means that the gas is routed to a common header up- and downstream of each process unit.
Our group have been responsible for the Review/Format/Translation/Verification and Signing of the documents and drawings provided by AFCM regarding the Albanian Compressor Station (Process, Civil, Architectural, Structural, HVAC, Civil Infrastructure, Fire Fighting, General Layouts, Electrical, Mechanical, Technical Reports and Calculations, etc.) for permitting applications.

Design and consultancy service for the firefighting project of two compressor stations ( in Bilisht and Fier). The design of the firefighting main ring to each compressor station, compartment and identification of the structure refers to Albanian law and norms where each structure has its own REI and EI for the doors. In the compressor hall its preview the design of the hydrants, firefighting signs, detection system with a main panel in the control room and a CO2 system to the turbine enclosure. Electrical room was control with smoke, flame and gas detector where in a protected room its preview installation an automatic extinguisher system with argon. Local assistance to the project for taking permit to the authority and local consultancy for the preparation of all necessary documents.

Read More...

Sewages System for Vlora, Ksamil, Kavaja, Lezha/Shengjin and Velipoja (Phase III)

Sewages System for Vlora, Ksamil, Kavaja, Lezha/Shengjin and...

- Design and Tender Documents for the...

- Design and Tender Documents for the Sewages System for Vlora and Ksamil and Works Supervision for Vlora, Ksamil, Kavaja, Lezha/Shengjin.
- Design of the Mechanical and Electrical works for the sewages system of Velipoja (Phase III). Project Europe aid / 131274 / C / SER/ AL.

Project Date: 2012 – 2016
Project Value: 14,200,000 €


Consultant:

SAFEGE
Ingenieurs Conseils
Gulldelle 92
1200 Brussels – Belgium
Ted SHELDIA
Country Director – Albania
Mobile: +355 69 32.96.073
ted.sheldia@safege.be

Client/Beneficiary:

Albanian Government

Financed:

The Consortium and the Delegation of the European Commission in Albania
ABA Business Center, Rr. Papa Gjon Pali II, 17th floor,Tirana – Albania
Phone: (+355) 4 222 8320
Fax: (+355) 4 223 0752
delegation-albania@eeas.europa.eu

Design of the Mechanical works for the sewages system for Vlora Design of the two pumping station, support to the electrical and structural design, preparation of the preliminary estimation and draft calculation of the pumps and collection shafts.

Design of the Mechanical and Electrical works for the sewages system of Velipoja (Phase III). Project Design of six pumping stations due to all the main rouge of the sewages pipeline and the waste treatment plant with all mechanical technical specification, bill of quantity and preparation of tender dossier for the biding period.

Read More...

Consultancy, Design and Supervision Works for Health for All Projects (HAP)

Consultancy, Design and Supervision Works for Health for All...

Archimed has offered these services...

Archimed has offered these services regarding HAP project:
- Technical assistance for designing of Rehabilitation of health centers and polyclinic in Lushnja;
- Technical assistance for designing of Rehabilitation of health centers in Vora and Sauk;
- Technical assistance for designing of Rehabilitation of health centers in Mallakaster and Klos Municipalities;
- Consultancy and supervision works for revision and tender for rehabilitation of health centres in Roskovec and Patos;
- Supervision Works for the rehabilitation of Libofsha and Cakran Health Centres in Fier Municipality;
- Supervision Works for the rehabilitation of Reconstruction for the Kindergarten in fshati Rom Fier;
- Consultancy works for rehabilitation of Libofsha and Cakran in Fier Municipality;
- Supervision of the works done by the winning company for the “Faculty of Public Health”.


Project Date: 12/2015 - Ongoing
Project Value: 2,300,000 €


Consultant:

Studio Archimed
Street: Andon Z. Çajupi
Tirane, Albania
Phone/Fax: +355 44 304 827
www.archimed.al
info@archimed.al

Client/Beneficiary:

Save the Children Albania
Street: Komuna e Parisit
Tirane, Albania
Mobile: +355 69 202 4182
info.albania@savethechildren.org

Health for All Project (HAP)
Street: Themistokli Gëmenji
Tirane, Albania
Mobile: 355 69 226 9957
info@hap.org.al

Financed:

Health for All Project (HAP)
Street: Themistokli Gëmenji
Tirane, Albania
Mobile: 355 69 226 9957
info@hap.org.al




The Health for All Project (HAP) in Albania is funded by Swiss Agency for Development and Cooperation (SDC) of the Swiss Government and is being implemented by a consortium of three organizations: the Swiss Tropical and Public Health Institute (SwissTPH), and the two NGOs: Terre des hommes (Tdh) and Save the Children (SC) through HAP Center. Its overall goal is that the Albanian population, benefit from better health due to improved primary health care services and health promotion activities.

Read More...

Tirana Business Park – First Phase

Tirana Business Park – First Phase

Our group services included: -...

Our group services included:
- Consultancy about the fire protection and civil emergency service for infrastructure and architecture.
- Supervision of works known as the first construction phase (Phase I) for the Architectural, civil, infrastructure, mechanical and electrical works.


Project Date: 12/2010 – 07/2015
Project Value: 21,700,000 € / 152,600,000 €


Consultant:

Studio Archimed
Street: Andon Z. Çajupi
Tirana, Albania
Phone/Fax: 00355 44 304 827
www.archimed.al
info@archimed.al

Client/Beneficiary:

Tirana Business Park sh.p.k
Str.Deshmoret e 4 Shkurtit,Sky Tower 8/4
Tirana, Albania
Phone: +355 4 44 15 154
Fax: +49 8723 20 34 28
info@tiranabusinesspark.com

Financed:

Tirana Business Park sh.p.k
Str. Deshmoret e 4 Shkurtit,Sky Tower 8/4
Tirana, Albania
Phone: +355 4 44 15 154
Fax: +49 8723 20 34 28
info@tiranabusinesspark.com

Tirana Business Park is a project aiming to establish a business park and an economic centre of European standards, and to give the Albanian area a real potential of economic and social development. Tirana Business Park stands for a new, excellent working location: A city within a city. It is a genuine concept – urbanism, architecture, landscape, traffic, infrastructure – for a premium business community.

Read More...

Supervision of Construction Works for Infrastructure Schemes in North Kosovo

Supervision of Construction Works for Infrastructure Schemes in...

Archimed mission was preparation of the...

Archimed mission was preparation of the detail design for the Sport Hall, of the Zvecan Municipality and the entire project for the new building of the Mitrovica Municipality.


Project Date: 07/2014 – 02/2015
Project Value: 5.600.000 €


Consultant:

Joint Venture (JV) of PLANET S.A and EPRD
Szkolna 36A Street, 25-604 Kielce, Poland
tzilly@gmx.de
i.banach@eprd.pl
Phone: +48 41 345 32 71

Client/Beneficiary:

EUOK (European Union Office in Kosovo)
Tel: +381385131278
Xhelal.IBRAHIMI@eeas.europa.eu

Financed:

EUOK (European Union Office in Kosovo)


The overall objective of the project was to support a more balanced regional development in Kosovo through increasing municipal social and economic infrastructure, the quality of life and economic development of Kosovo municipalities. The purpose of this contract was to assume the function of Supervisor as is set out in PRAG Conditions and rules, during the implementation of the Works Contracts in three municipalities in the north until the end of Defect Liability Period (issuing the Final Acceptance Certificate).

Read More...

Tirana Masterplan

Tirana Masterplan

Archimed mission was preparation of...

Archimed mission was preparation of preliminary and detailed final designs for the firefighting system of the underground two floor parking area, part of Tirana Masterplan.


Project Date: 01/2013 – 03/2013
Project Value: 7,000,000 €


Consultant:

GRIMSHAW
57 Clerkenwell Road
London EC1M 5NG UK
Phone: +44 (0)20 7291 4141
Fax: +44 (0)20 7291 4194
info@grimshaw-architects.com
www.grimshaw-architects.com

TECNIC Consultancy Engineering
Via Panama 86A
00198 Roma,ITALIA
Phone: +39 06/85355088
Fax: +39 06/85355096
tecnic@tecnic-spa.it

Client/Beneficiary:

MUNICIPALITY OF TIRANA
“Dëshmorët e Kombit” Avenue
Tirana, Albania
Phone/Fax: + 355 4 226629
Fax: + 355 4 2228430
www.tirana.al

Financed:

MUNICIPALITY OF TIRANA
“Dëshmorët e Kombit” Avenue
Tirana, Albania
Phone/Fax: + 355 4 226629
Fax: + 355 4 2228430
www.tirana.al


Encompassing one-fifth of the city of Tirana, this master plan forms a new backbone with which to shape Albania’s capital. Both river park and boulevard are structured around a sequence of open, green spaces that are considered as ‘urban living rooms’. They reflect the outdoor culture of Tirana and offer citizens places in which to interact and take part in programmes of public art and activities. The positive perception of the city will grow in concert with the open accessible nature of these spaces that give relief from the urban environment.

Read More...

Catholic Hospital Tirana

Catholic Hospital Tirana

Archimed mission was: - Preliminary and...

Archimed mission was:
- Preliminary and Detailed Final Designs for the Mechanical and Electrical system.
- Reinforcement and Structural Detailed Designs (Addendum Contract).

Project Date: 11/2011 – 10/2013
Project Value: 17,000,000.00 €


Consultant:

Architekturstudio Andreas Mezey
Zum Sommersberg 28A 50321 Brühl
T: +49 2232 21 36 663
M: +49 1573 73 41 443
www.architekturstudio-mezey.de
a.mezey@architekturstudio-mezey.de

Client/Beneficiary:

Our Lady of Good Counsel
Dritan Hoxha Str., Tirana, Albania
Phone: 00355 4 2273290
Fax: 00355 4 2273291
info@unzkm.edu.al
www.unizkm.al

Financed:

Our Lady of Good Counsel
Dritan Hoxha Str., Tirana, Albania
Phone: 00355 4 2273290
Fax: 00355 4 2273291
info@unzkm.edu.al
www.unizkm.al

The Congregation “Mother of Good Counsel” has awarded an order for the finalisation of the existing hospital building in Tirana. A Business Plan was created with the goal to ascertain the economic viability and necessity of the hospital of basic care and orthopedic profile. Based on the results of the business plan the original project was updated. The hospital has 110 beds and four operating theaters. As the building is situated near the Medical University operated by the same congregation, the students can share the facility.

Read More...

Rehabilitation of Shkodra Regional Hospital - 3rd Phase

Rehabilitation of Shkodra Regional Hospital - 3rd Phase

Archimed scope of work included : -...

Archimed scope of work included :
- Design / Supervision Works for the Rehabilitation of Shkodra Regional Hospital - 3rd Phase.
- Completion of the realization of departments and services comprised in the initial Master Plan and according to the results of the update and as required by CEB technical mission.


Project Date: 11/2009 – 03/2013
Project Value: 8,200,000 €


Consultant:

Top consult Köln GmbH, Max-Planck-Straße 29
D-50858 Köln (Marsdorf)
Phone: 00492234-95412-0
Fax: 00492234-95412-12
www.topconsultkoeln.de
e-mail: mail@topconsultkoeln.de

Client/Beneficiary:

Ministry of Health, Republic of Albania
Boulevard “Bajram Curri”
Tirana, Albania
Phone: +355 4 2376 178
Fax: +355 4 2362 937
e-mail: info@shendetesia.gov.al

Financed:

World bank (WB) and Council of Europe Development Bank (CEB)




Reconstruction and extension of the regional hospital with 374 beds in three phases. The 3rd Phase had entailed the reorganization of the Hospital’s available space in a more functional scheme as well as the extension of certain Hospital areas to be able to offer more and better medical services. At the same time, management has been enhanced, a registration system has been set up, all the electrical and mechanical installations had been upgraded, the deficient water and waste management systems had been improved and a solar, environmentally friendly, source of energy had been installed.

Read More...

Tirana University Hospital Center (TUHC)

Tirana University Hospital Center (TUHC)

Our scope of work regarding Mother Teresa...

Our scope of work regarding Mother Teresa Hospital had been:

- “Mother Teresa” Tirana University Hospital Centre (TUHC), First Phase. Evaluation and planning of Tertiary Training and Research Hospital with 93 beds.
- Management, Design and Supervision of Works for "Improvement of the Severe Burns Unit in Mother Teresa Hospital, Tirana, Albania".


Project Date: 2008 – 2011
Project Value: 17,500,000.0 / 1,400,000.0 €


Consultant:

Top consult Köln GmbH
Max-Planck-Straße 29
D-50858 Köln (Marsdorf)
Phone: 00492234-95412-0
Fax: 00492234-95412-12
www.topconsultkoeln.de
mail@topconsultkoeln.de

Studio Atelier4
Sami Frasheri Street
Tirana, Albania
Phone: +355 4 2222 804
info@atelier4-architects.com

Client/Beneficiary:

Ministry of Health, Republic of Albania
“Bajram Curri” Boulevard
Tirana, Albania
Phone: +355 4 2376 178
Fax: +355 4 2362 937
info@shendetesia.gov.al

Financed:

Delegation of the European Union to Albania (EU)
Council of Europe Development Bank (CEB)





Design of the Mechanical (firefighting systems, plumbing, energy efficiency, HVAC and Building Management System) and Electrical works – First phase.
Supervision of the architectural, structural, mechanical and electrical installation for all the construction period.
Assistance during the liability period.

Read More...

Tirana East Gate Shopping Centre

Tirana East Gate Shopping Centre

Archimed scope of work included: -...

Archimed scope of work included:
- Engineering Consultancy and Supervision services for the Mechanical installation system of the new modern center in east part of Tirana (execution period 2009 - 2011).

- Due Diligence Report
Technical/ visual inspection of each element/ component part of the structure and fabric of the building, inspection of building services and a review of the statutory project documentation, with emphasis on issues which will need to be included in Capital Expenditure list (execution period 2016).


Project Date: 2009 – 2016
Project Value: 50,000,000 €

Consultant:

Curona Design Limited
17 Leathermarket Street, London SE1 3HN
Phone: +44 (0) 207 357 0444
Fax: +44 (0) 207 357 0453
curona@curonadesign.com www.curonadesign.com

Jones Lang LaSalle d.o.o.
10L Mihajla Pupina Blvd, 11070 New Belgrade, Serbia
Milan Sovilj, Project Manager
milan.sovilj@eu.jll.com
www.us.jll.com

Client/Beneficiary:

Mane TCI l.t.d
Rr. “Dervish Hima”, Tiranë, Shqipëri
Tel:+355 44502124

TEG - Tirana East Gate
Rr. National road Tiranë - Elbasan, Tirana, Albania.

Financed:

European Development Bank







"Tirana East Gate” is the largest shopping mall in Albania. With 142 stores and 2,000 parking spaces, Tirana East Gate is an attractive destination not only for Tirana, but even for Elbasan. With a construction area of over 95,700 m2, this mall was built to be distinguished for the variety of brands and products, entertainment spaces, coffee shops and maximum comfort for the customers.
Tirana East Gate has 7 million visitors per year.

Read More...

SGS Technical Control Centres

SGS Technical Control Centres

Archimed scope of work included Design and...

Archimed scope of work included Design and Supervision for:

- Construction of the New Tirana Automotive Technical Control Centre.
- Reconstruction of 5 Regional Technical Control Centres.
- Renovation works on QKT Tirana 2 and budget prevision for New Technical Center in Tirana


Project Date: 03/2010 – 07/2014
Project Value: 3,028,000 €


Consultant:

Studio Archimed
Street: Abdyl Frasheri, Ap.6/1
Tirana, Albania
Mobile: 00355 692095975
www.archimed.al
info@archimed.al

Client/Beneficiary:

SGS Automotive Albania
Rr.Teodor Keko, Egi center, Kutia postare 2408,
Tirana, Albania
Tel: +35542357965,
Fax: +35544500482
www.sgs.com

Financed:

SGS Genève, Switzerland
1 place des Alpes
P.O. Box 21521211
Geneva 1
Switzerland
Tel: +41 22 739 91 11
Fax: +41 22 739 98 86

Mechanical supervising and evaluate assigned staff; Establish and maintain systems to ensure the quality of work undertaken; Control testing activities during construction works; Determine corrective action required when there are discrepancies between work executed and the approved plans, specifications and standards; Predict resources requirements including personnel, equipment and software; Perform calculations and operate computer software; Research and propose necessary changes to systems, procedures and equipment; Take samples of materials for examination or analysis.

Read More...

New Combined Cycle Power Plant at Vlore

New Combined Cycle Power Plant at Vlore

Archimed scope of work included: -...

Archimed scope of work included:

- Preparation of the design for the implementation work (workshop drawings, as build drawings, technical documents etc.) and supervision of the mechanical installation systems.


Project Date: 11/2008 – 04/2010
Project Value: 130,000,000 €


Consultant:

Maire Engineering (Maire Tecnimont Group
Deshmoret e 4 Shkurtit Str., Sky Tower, 5th floor
Tirana, Albania
Project Manager: Dario Talarico

Degina sh.p.k
Myslym Shyri,1st Palace,Ap1
Tirana, Albania
deginashpk@gmail.com

Client/Beneficiary:

K.E.SH Sh.a (Electro Energetic Albanian Corporate)
Vasil Shanto Block
Tirana, Albania
Phone: 04 259 728

Financed:

World Bank

European Bank for Reconstruction and Development (EBRD)

European Investment Bank (EIB)

Albanian Energy Corporation (KESH)

World Bank

The objective of the project implementation is: the guarantee for meeting the demand for electricity supply; efficiency in its supply and use; financial efficiency in the private sector, increase of power generation from power plants to meet the domestic demand of the base load. TEC is a combined cycle power plant in a six-hectare site, about six miles north of Vlora. The plant is designed to allow its use with natural gas.

Read More...

Construction of the New Ferry Terminal Durres, Albania (First/Second phase).

Construction of the New Ferry Terminal Durres, Albania...

Our group services included: -...

Our group services included:
- Supervision services of the Civil works and Quantity / Quality Surveyor Expertise for both Construction phases
- Design and Supervision of the Mechanical and Electrical Installation Works.


Project Date: 07/2008 – 06/2012
Project Value: 21,200,000 €


Consultant:

DIWI Consult International GmbH (first phase)
Sky Tower Suite 112
Dëshmorët e 4 Shkurtit Str., Tirana, Albania
Phone/Fax: +355 42221666

SAFAGE (second phase)
Ted SHELDIA,Country Director - Albania
Tel (AL): +355 69 32.96.073
Tel (B): +32 478 56.72.78
ted.sheldia@safege.be

Client/Beneficiary:

Ministry of Public Works, Transport, and Telecommunication, Republic of Albania
Skënderbeg Square, No.5
Tirana, Albania
Phone: +355 4 2232320
Fax: +355 4 2380741
Kujtim.Hashorva@mppt.gov.al

Financed:

European Investment Bank
98-100, boulevar250pxd Konrad Adenauer
L-2950 Luxembourg
Phone: (+352) 43 79 1
Fax: (+352) 43 77 04




* Preparation of Mechanical and Electrical:
- Detailed Designs;
- Bill of Quantity;
- Technical Specifications for the one main ferry terminal in Albanian which has the biggest human and material transportation systems.
Due to the importance of the terminal was design a modern firefighting system using the water from the sea, where the pumping station was design to fulfill the norms and the requirements to support the using of the sea water. In the entire terminal are install hydrants, portable extinguishers, detectors and emergency lighting, the main detection panel it’s install in the control room and from there in case of fire make possible the closing of the dampers install in the duct channel in way to not spread the fire all over the terminal building.

* Supervision services of the Civil works and Quantity / Quality Surveyor Expertise of entire construction process all over the two phases.

Read More...

Mother Teresa International Airport Tower and Base Building Albania

Mother Teresa International Airport Tower and Base Building Albania

Archimed mission was: - Consultancy...

Archimed mission was:
- Consultancy services for the Mechanical installation systems of Mother Teresa International Airport Tower and Base Building Albania.

Project Date: 2008 – 2009
Project Value: 29,856,000.00 €


Consultant:

Studio Archimed
Street: Abdyl Frasheri
Tirana, Albania
Mobile: 00355 692095975
www.archimed.al
info@archimed.al

Client/Beneficiary:

Construction Institute, Tirana – Albania

Financed:

National Air Traffic Agency
Mother Tereza Airport
P.O. Box 8172
Rinas, Albania
Phone: +355 4 4522 113
Fax. +355 4 2375 805
info@anta.com.al

Facing the need for further development of the airport, the Council of Ministers decided to tender for international investors to construct a new terminal and other facilities, as well as run the operations, at the airport.
Our group provided consultancy services for mechanical installations.

Read More...