Archimed scope of work included:
- Preparation of the design for the implementation work (workshop drawings, as build drawings, technical documents etc.) and supervision of the mechanical installation systems.
Project Date: 11/2008 – 04/2010 |
Project Value: 130,000,000 € |
Maire Engineering (Maire Tecnimont Group
Deshmoret e 4 Shkurtit Str., Sky Tower, 5th floor
Tirana, Albania
Project Manager: Dario Talarico
Degina sh.p.k
Myslym Shyri,1st Palace,Ap1
Tirana, Albania
deginashpk@gmail.com
K.E.SH Sh.a (Electro Energetic Albanian Corporate)
Vasil Shanto Block
Tirana, Albania
Phone: 04 259 728
World Bank
European Bank for Reconstruction and Development (EBRD)
European Investment Bank (EIB)
Albanian Energy Corporation (KESH)
World Bank
The objective of the project implementation is: the guarantee for meeting the demand for electricity supply; efficiency in its supply and use; financial efficiency in the private sector, increase of power generation from power plants to meet the domestic demand of the base load. TEC is a combined cycle power plant in a six-hectare site, about six miles north of Vlora. The plant is designed to allow its use with natural gas.