Supervision Works in the frame of ESM Project for ​Banja HPP

In the frame of ESM Project for Banja HPP, our group scope of work included:

- Supervision of Shtepanj irrigation channel;
- Supervision of works for construction of a waste water treatment plant for Gramsh Municipality and Pishaj Commune;
- Supervision of construction of the Potable water system for the villages Shushice, Drize and Cerruje.


Project Date: 05/2016 - 07/2018
Project Value: 1,851,890 €


Consultant:

Studio Archimed
Street: Andon Z. Çajupi, pll.22
Tirana, Albania
Mobile: 00355 692095975
www.archimed.al
info@archimed.al

Client/Beneficiary:

Devoll Hydropower Sh.A
ABA Business Center, Office 1204
Papa Gjon Pali II
Tirana,Albania
Phone: +355 4 450 14 50
www.devollhydropower.al

Financed:

Devoll Hydropower Sh.A
ABA Business Center, Office 1204
Papa Gjon Pali II
Tirana,Albania
Phone: +355 4 450 14 50
www.devollhydropower.al

Rehabilitation of the Shtepanj irrigation channel is in distance about 3.5 km from the intake. It has been combined with cleaning and repairing works for irrigation channel structures, to allow for the required quantity of water to reach the last edge of the channel.

The Waste Water Treatment Plant included mechanical purification for the sewage and digestion for the settled sludge. Special consideration has bene applied and preparatory measures has been implemented on the site of the WWTP to the fact that the sewage collection system is a mixed system. Therefore waste and rain water were collected and diverted to the WWTP.

DHP in the framework of replacing the existing infrastructure, planned to build a water supply system for the villages of Shushice, Drize and Cerruje, as part of the resettlement infrastructure affected by the construction of Banja hydro power plant.