Archimed scope of work was Design and Supervision works for the Construction of the ‘New Pre-trial Detention Center and prison” in Shkoder, Albania.
Project Date: 11/2011 – 06/2018 |
Project Value: 18,000,000 € |
iC consulenten
Street: Sulejman Delvina
Erwin Puschnigg (Team Leader)
Phone: +355 48 30 25 76 /78
Mobile: +355 68 2061 084 : +43 664 1503 206
e.puschnigg@ic-group.org
www.ic-group.org
Ministry of Justice, Republic of Albania
Boulevard of “Zogu i Pare”
Tirana, Albania
Phone/Fax: + 355 4 22 33591
www.justice.gov.al
Delegation of the European Commission in Albania
ABA Business Center, Papa Gjon Pali II Str., 17th floor
Tirana, Albania
Phone: (+355) 4 222 8320
Fax: (+355) 4 223 0752
delegation-albania@eeas.europa.eu
This project had significantly contributed towards a more efficient functioning of the Penitentiary system in Albania thus ensuring:
- Improved respect for human rights and the rights of detainees;
- Improved living conditions for pre-trial detainees and detainees;
- Reduction of overcrowding in penitentiary centers.
The project has foreseen also the introduction of a more efficient, rational and sustainable utilization of energy by applying, in addition to traditional sources of energy such as petrol and gas, alternative renewable sources of energy like solar panels, in accordance with the EU Directive 2010/31 of 19 May 2010 on the energy performance of buildings.